Our painting process includes(as required):
*Detailed door hanger or equal that provides notification to residents/tenants of start times and procedures.
*Bleaching and Hydro washing of surfaces to be painted.
*Trenching dirt areas below existing grade.
*Stucco patching to match existing texture as close as possible
*Sanding, wire brushing and scaping loose paint.
*Sanding and priming of all bare and exposed wood.
*Caulking of exposed stucco to wood joints and vertical fascia joints.
*Preparation and priming of any rusty areas on ferrous metal.
*Application of all materials by trained and experienced professionals.
*Daily/weekly progress walks to ensure quality and consistency.
*All materials and equipment stored on site in a portable storage bin.
Upon completion:
Each resident recieves a notice/survey which states that the work has been completed on their home and which allows them to provide importaint feedback to us. This notice is then given to the job foreman for followup and completion.
A final job walk/inspection with the H.O.A. member(s) and management professional after all areas have been completed.